What should be paid attention to in the process of laying cable tray
Release time:
2024-01-03
and the cable used should be certified and meet the formal design requirements, alloy cable trayand its insulation should be checked before use



The exterior of the cable tray needs to be checked before laying, and the cable used should be certified and meet the formal design requirements, alloy cable trayand its insulation should be checked before use.
Wiring and installation of routing should be distinguished, not only installation specifications, but also in line with the beautiful, to facilitate future maintenance.
The angle of the cable bridge should be consistent with the angle of the building, connect the bridge and the bridge with a connecting plate, and fix it with semi-round head bolts. It is not allowed to carry people until the installation of the cable bridge is completed, unless there is a need to carry people, adequate safeguards are needed.
Keywords:
Latest News
Shandong Hongfeng Electric Group Co., Ltd.
2025-06-19
Shandong Hongfeng Electric Group Co., Ltd.
2025-06-17
Cable Tray Selection for Solar Power Plants
2025-06-17
Installation mode of steel trough cable tray
2024-02-17
Submit information for support
Hongfeng Group has become one of the "best-selling brands" in the cable tray industry with its plant size, product quality and warm service.Sincerely hope to serve our customers with the best service and quality and create value for all customers. We are trying our best to be your most satisfied partner.
No.2 House, Jialong Road, Jiaming Industrial Park, Dongchangfu District, Liaocheng City, Shandong Province, China